|
|
|
|
|
Available Tenders |
|
|
|
Search Tenders |
Corrigendum
|
|
|
|
|
|
|
|
Please
Click on the Tender No. to see more details. You must login to download the
tenders.
New Users can
Register
here. |
| |
|
Tender No |
Description |
Issue Date |
Opening Date |
Corrigendum |
|
NGC/D/GMHK/06/10 |
General maintenance and house keeping work at Diesel Loco Shed New Guwahati, N. F. Railway for two years
|
28/9/2010 |
10/10/2028 3:00:00 PM |
1) Corrigendum1 Dated: 7/10/2010
|
|
KIR/Engg./01-54-11 |
At Katihar – Maintenance and house keeping of ORH & Subordinate Rest House. |
9/1/2012 |
24/11/2012 3:00:00 PM |
1) 01 dtd 12/01/2012 Dated: 13/1/2012
|
|
21/I/RNY of 2011-12 (SL-01) |
Provision of basic infrastructure at level crossing gate under ADEN/RNY & BPRD |
24/2/2012 |
16/3/2012 3:00:00 PM |
Nil |
|
TRACK/02/05 OF 2011 |
Manufacture & supply of GFN Liner to RDSO’s Drg. No.T-3706 as per latest alterations. |
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
TRACK/02/06 OF 2011 |
Manufacture & supply of 60 Kg Fan Shape Switch 1 in 12 to RDSO’s Drg. No.T-4219 as per latest alterations. |
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
TRACK/02/07 OF 2011 |
Manufacture & supply of 60 Kg CMS Crossing 1 in 12 to RDSO’s Drg. No.T-4220 as per latest alterations. |
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
TRACK/02/08 OF 2011 |
Manufacture & supply of Combination SEJ to RDSO’s Drg. No.T-6782 as per latest alterations. |
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
TRACK/02/09 OF 2011 |
(a) Manufacture & supply of Improved SEJ 60 Kg to RDSO’s Drg. No. T-6902 as per latest alterations.
(b) Manufacture & supply of Improved SEJ 60 Kg to RDSO’s Drg. No T-6922 as per latest alterations.
(c) Manufacture & supply of Improved SEJ 52 Kg to RDSO’s Drg. No. T-6914 as per latest alterations.
(d)Manufacture & supply of Improved SEJ 52 Kg to RDSO’s Drg. No. T-6930 as per latest alterations.
|
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
TRACK/02/03 OF 2011 |
Manufacture & supply of Nylone Cord reinforced GRSP to RDSO’s Drg. No.T/7014 to 7021 as per latest alterations. |
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
TRACK/02/02 OF 2011 |
Manufacture & supply of Improved Rail Pad to RDSO’s Drg. No. T/6942 as per latest alterations. |
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
TRACK/02/01 OF 2011 |
Manufacture & supply of ERC MK-V to RDSO’s Drg. No. T/5919 as per latest alterations. |
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
TRACK/02/04 OF 2011 |
Manufacture & supply of Metal Liner to RDSO’s Drg. No. T-3740 as per latest alterations. |
27/2/2012 |
15/3/2012 11:00:00 AM |
Nil |
|
AP/S&T/29/2011-2012 |
Replacement of U.G .signaling cables found with low insulation during the cable testing at 38 signaling installations in BG-I, BG-II & BG-III section of APDJ division in N.F.Railway.
|
10/1/2012 |
14/3/2012 3:30:00 PM |
1) 01 Dated: 3/2/2012
|
|
RNY/EL/T-12/2011-12 |
At Rangiya- Electrical works in connection with construction of Type-V quarters (Four units) DS Qrs |
14/2/2012 |
14/3/2012 3:00:00 PM |
Nil |
|
RNY/EL/T-13/2011-12 |
Electrical works in connection with provision of SS room and operating store room at RGJI, DPRA, MZQ, KRNI and SS room at DDNI & PNVT |
14/2/2012 |
14/3/2012 3:00:00 PM |
Nil |
|
KIR/Engg/01-03-12 dtd 31/01/12 |
(i) New Jalpaiguri – Malda Town section(BG) ‘B’ Route (Double line section) through ballast recoupment from Km.152 to 156(Dn line), Km.172 to 175(Dn line), Km.227-231(Dn line) and from Km.110-113(Up line), Km.152-156(Up line) of NJP-MLDT section, Total = 19 Km.(ii) Manufacturing, Supplying, loading, un-loading and spreading of 50mm size m/c ballast of KIR Division at Harish Chandrapur Depot. |
28/2/2012 |
14/3/2012 3:00:00 PM |
Nil |
|
KIR/Engg/02-03-12 dtd 31/01/12 |
(A) BG TTR(P) of the existing 90R 1 in 8.5 on wooden sleeper by 52 Kg FS 1 in 8.5 on PSC sleeper point No.169A, 213, 214 at old NJP Yard. DN Line Point No.1N, 2N & 3N (New yard NJP at ABFC end). Point No.9HY to 17 HY (New yard NJP at RNI end) 18HY to 20 HY, 5N to 8N (New yard, NJP at ABFC end) Total = 22 Sets. (B) BG TTR(P) of the existing 90R 1 in 8.5 on wooden sleeper by 52 Kg FS 1 in 8.5 on PSC sleeper point no.35,45,55 siding line NJP, Point No.206, 207 New Yard/NJP at RNI end & Point No.1S & 2S at NJP new yard at RNI end. Total 7 Sets. (C) BG TTR(P) of the existing 1 in 8.5 90R on wooden sleeper by 52 Kg FS 1 in 8.5 on PSC sleeper vide point No.E1/RNI to E5/RNI=5 sets, point no.28 to 31 Pit Line/NJP, Point No.1,2 stack Line/NJP. Total = 11 Sets (D) BG TTR(P) of the existing 90R 1 in 8.5 on wooden sleeper by 52 Kg FS 1 in 8.5 on PSC sleeper Point No.1HY to 5HY at new yard NJP at RNI end, point No.6HY to 8HY at New yard/NJP at ABFC end Point No.1 to 3 of ballast siding/NJP Point No.1 to 3 of machine siding/NJP yard. Total = 14 sets. |
28/2/2012 |
14/3/2012 3:00:00 PM |
Nil |
|
KIR/Engg/03-03-12 dtd 31/01/12 |
Reconditioning of 1 in 8.5 &1 in 12 Xing body & switch and wheel burn/scrabbed rail and cupped joints under the jurisdiction of Sr.DEN/Line/KIR. |
28/2/2012 |
14/3/2012 3:00:00 PM |
Nil |
|
D1-20RN01 |
Hiring of Multi-Utility vehicles or similar vehicle for SSE/P-way/RNY & BPRD section for emergency restoration and other maintenance work of track |
20/2/2012 |
13/3/2012 3:00:00 PM |
Nil |
|
DCBRL/01/2012/MLG 02 of 05 |
SN-2 Name of Works:- Manufacturing, Supplying and Installation of Man Refuges in Br. Nos. 29,46, 52,74, 96, 105, 132,139,145,158,172,180,186,191,196,219,227 in the section SGUJ-APDJ; Br. Nos. 276,292UP, 316UP, 323UP,329UP,363UP,373UP,394UP,422UP, 435UP in the section APDJ-DTX; Br. Nos. 3,8,25 & 53 in the section APDJ-GTLD; Br. Nos. 40,59,85,88,94, 116, 150 in the section RQJ-NOQ; Br. Nos. 179DN,196DN,209DN,240DN, 250DN, 270DN,293DN in the section NOQ-DTX; Br. No. 5 in the section FKM-DBB under SSE/Bridge/SGUJ in APDJ Div. as per RDSO’s Drg. No. CBS-0028. |
24/2/2012 |
13/3/2012 3:00:00 PM |
Nil |
|
|
|
|
|
|
|
First : Previous [ 1 2 3 4 5 6 ] Next : Last |
|
|