Login

Password

Go

 Home | Tenders | Earning Tenders | Contract Details

 Welcome, Guest
Register Now

for download tenders

 

Advertisement

 

 

 

Available Tenders

 
 Search Tenders Corrigendum
 
  Division  
Department  
  Opening Date       (DD/MM/YYYY)  
  Tender No.
 

 Please Click on the Tender No. to see more details. You must login to download the tenders.
New Users can
Register here.

 

 Tender No

  Description

 Issue Date  

Opening Date

Corrigendum

N/2010/K-26

Provision of Fuse Monitoring and Indication system with Automatic changeover to Standby fuse at 25 stations of Katihar division.

14/9/2010

11/10/2010 3:00:00 PM

Nil

EL/W/Solar/02/10-11

N.F.Railway : Supply, Installation and commissioning of Grid connect Solar Generating System and Solar Based Water Heating System over various Divisions/Workshops of N.F.Railway

6/9/2010

8/10/2010 3:30:00 PM

Nil

APDJ/13/I of 2010

Alipurduar Division – Provision of Limited Subway at U/M L-xing No.NN/23 at Km.39/10-40/1 between Jalpaiguri road – New Domohini, NN/40 at Km.73/7-8 between Kholaigram-Salbari. & U/M L-xing No.NN/50 at Km.94/23 between Falakata - Gumanihat.

21/9/2010

7/10/2010 3:00:00 PM

Nil

APDJ/22/II/1 of 2010

At APDJ – Improvement of Officers’ Rest House, VIP Rest House including renovation of water supply, toilet, sewerage line etc. under the jurisdiction of SSE/W/II/APDJ.

22/9/2010

7/10/2010 3:00:00 PM

Nil

APDJ/22/II/2 of 2010

APDJ Division – Bridge No.5 (River Sankosh) at Km.9/2-4 Span 4x30.50m between SPX-TPK section FKM-DBB (Phase-A) protection of eroded edge of river bank with abutment & approach bank of Bridge.

22/9/2010

7/10/2010 3:00:00 PM

Nil

APDJ/22/II/3 of 2010

At DTX – Proposed Indoor Stadium for RWSC, NBQ under the jurisdiction of SSE/W/DTX.

22/9/2010

7/10/2010 3:00:00 PM

Nil

APDJ/15/III of 2010

Provision of 4 bays P.P. sheds on P.F. No.2 & 3 at HSA, BNV and DLO and extension of 4 bays P.P. Sheds on P.F. No.1 at KCF under the jurisdiction of SE/W/HSA.

22/9/2010

7/10/2010 3:00:00 PM

Nil

S&T/71/LMG/2010-11

Improvement of Sr. DSTE/LMG office with Modular work station

10/9/2010

6/10/2010 3:30:00 PM

Nil

AP/EL/39/10-11

At APDJ Divn Rewiring/Redressing of renovated chambers at DRM building, EDPM, crèche (NFRWWO) & Railway Hospital/APDJ & provision of pre paid metering system for outsider consumers of different stations.

2/9/2010

6/10/2010 3:30:00 PM

Nil

KIR/Engg/03-28-10

Casual renewal of points & crossing, SEJ and bridge approach sleeper etc. in KIR-KDPR section.

21/9/2010

6/10/2010 3:00:00 PM

Nil

KIR/Engg/04-28-10

At BORA – Repairs to main drainage system in colony area including all drains from back side of quarters to its outfall. (Total length of main drain = 1560 Rm).

21/9/2010

6/10/2010 3:00:00 PM

Nil

KIR/Engg/06-28-10

At SGUJ – Repairs and regarding of back bone colony drain leading from NG shed Himachal colony and Hospital colony to out fall of Mahananda river.

21/9/2010

6/10/2010 3:00:00 PM

Nil

1 (S)/TSK OF 2010

Hiring of Vehicle for night inspection, surprise inspections etc. for 10 occasions in a month for 09 months

21/9/2010

6/10/2010 3:00:00 PM

Nil

KIR/Engg/02-28-10

(a) At PRNA – Repairs to damaged platform coping wall of PF No. 3 at Katihar end. (b) At JBN – Repairs to Platform surface of PF No. 1.

21/9/2010

6/10/2010 3:00:00 PM

Nil

10/II/RNY of 2010-11 (Item - 01)

Section: BNGN, Zone No. 2/RNY: BNGN, NBQ & DTX all officer’s bunglows, officer’s rest house and officer’s club

21/9/2010

6/10/2010 3:00:00 PM

Nil

KIR/Engg/01-28-10

Reconditioning of Point & crossing, SEJ, etc. under the jurisdiction of Sr. DEN/II/KIR.

21/9/2010

6/10/2010 3:00:00 PM

Nil

KIR/Engg/08-28-10

At New Jalpaiguri – Construction of New Running Room.

21/9/2010

6/10/2010 3:00:00 PM

Nil

KIR/Engg/05-28-10

At SGUT – Replacement of overhead steel tank by RCC tank (30000 gallon capacity) including pipe line.

21/9/2010

6/10/2010 3:00:00 PM

Nil

KIR/Engg/07-28-10

At Katihar Division – Construction of Linen section for keeping used and washed linen at KIR, KNE & NJP.

21/9/2010

6/10/2010 3:00:00 PM

Nil

29/TSK OF 2010

(a) BG TSR (P) of existing CST-9 sleeper (M+4) with PSC sleeper (M+8) from km. 23.61 to 48.95 between MXN-NMGY. Total = 25.34 km. (By PQRS Machine) (b) Conversion of SWR track to LWR from km. 23.61 to 48.95 between MXN-NMGY. Total = 25.34 km.

20/9/2010

6/10/2010 3:00:00 PM

Nil

       

First : Previous [  1 2 3 4 5 6 7 8 9 10 ] Next : Last  

 
 

Site Designed, Developed & Maintained By Webx