|
|
|
|
|
Available Tenders |
|
|
|
Search Tenders |
Corrigendum
|
|
|
|
|
|
|
|
Please
Click on the Tender No. to see more details. You must login to download the
tenders.
New Users can
Register
here. |
| |
|
Tender No |
Description |
Issue Date |
Opening Date |
Corrigendum |
|
N/2010/K-26 |
Provision of Fuse Monitoring and Indication system with Automatic changeover to Standby fuse at 25 stations of Katihar division. |
14/9/2010 |
11/10/2010 3:00:00 PM |
Nil |
|
EL/W/Solar/02/10-11 |
N.F.Railway : Supply, Installation and commissioning of Grid connect Solar Generating System and Solar Based Water Heating System over various Divisions/Workshops of N.F.Railway |
6/9/2010 |
8/10/2010 3:30:00 PM |
Nil |
|
APDJ/13/I of 2010 |
Alipurduar Division – Provision of Limited Subway at U/M L-xing No.NN/23 at Km.39/10-40/1 between Jalpaiguri road – New Domohini, NN/40 at Km.73/7-8 between Kholaigram-Salbari. & U/M L-xing No.NN/50 at Km.94/23 between Falakata - Gumanihat. |
21/9/2010 |
7/10/2010 3:00:00 PM |
Nil |
|
APDJ/22/II/1 of 2010 |
At APDJ – Improvement of Officers’ Rest House, VIP Rest House including renovation of water supply, toilet, sewerage line etc. under the jurisdiction of SSE/W/II/APDJ. |
22/9/2010 |
7/10/2010 3:00:00 PM |
Nil |
|
APDJ/22/II/2 of 2010 |
APDJ Division – Bridge No.5 (River Sankosh) at Km.9/2-4 Span 4x30.50m between SPX-TPK section FKM-DBB (Phase-A) protection of eroded edge of river bank with abutment & approach bank of Bridge. |
22/9/2010 |
7/10/2010 3:00:00 PM |
Nil |
|
APDJ/22/II/3 of 2010 |
At DTX – Proposed Indoor Stadium for RWSC, NBQ under the jurisdiction of SSE/W/DTX. |
22/9/2010 |
7/10/2010 3:00:00 PM |
Nil |
|
APDJ/15/III of 2010 |
Provision of 4 bays P.P. sheds on P.F. No.2 & 3 at HSA, BNV and DLO and extension of 4 bays P.P. Sheds on P.F. No.1 at KCF under the jurisdiction of SE/W/HSA. |
22/9/2010 |
7/10/2010 3:00:00 PM |
Nil |
|
S&T/71/LMG/2010-11 |
Improvement of Sr. DSTE/LMG office with Modular work station |
10/9/2010 |
6/10/2010 3:30:00 PM |
Nil |
|
AP/EL/39/10-11 |
At APDJ Divn Rewiring/Redressing of renovated chambers at DRM building, EDPM, crèche (NFRWWO) & Railway Hospital/APDJ & provision of pre paid metering system for outsider consumers of different stations. |
2/9/2010 |
6/10/2010 3:30:00 PM |
Nil |
|
KIR/Engg/03-28-10 |
Casual renewal of points & crossing, SEJ and bridge approach sleeper etc. in KIR-KDPR section. |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
KIR/Engg/04-28-10 |
At BORA – Repairs to main drainage system in colony area including all drains from back side of quarters to its outfall. (Total length of main drain = 1560 Rm). |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
KIR/Engg/06-28-10 |
At SGUJ – Repairs and regarding of back bone colony drain leading from NG shed Himachal colony and Hospital colony to out fall of Mahananda river. |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
1 (S)/TSK OF 2010 |
Hiring of Vehicle for night inspection, surprise inspections etc. for 10 occasions in a month for 09 months |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
KIR/Engg/02-28-10 |
(a) At PRNA – Repairs to damaged platform coping wall of PF No. 3 at Katihar end. (b) At JBN – Repairs to Platform surface of PF No. 1. |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
10/II/RNY of 2010-11 (Item - 01) |
Section: BNGN, Zone No. 2/RNY: BNGN, NBQ & DTX all officer’s bunglows, officer’s rest house and officer’s club |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
KIR/Engg/01-28-10 |
Reconditioning of Point & crossing, SEJ, etc. under the jurisdiction of Sr. DEN/II/KIR. |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
KIR/Engg/08-28-10 |
At New Jalpaiguri – Construction of New Running Room. |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
KIR/Engg/05-28-10 |
At SGUT – Replacement of overhead steel tank by RCC tank (30000 gallon capacity) including pipe line. |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
KIR/Engg/07-28-10 |
At Katihar Division – Construction of Linen section for keeping used and washed linen at KIR, KNE & NJP. |
21/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
29/TSK OF 2010 |
(a) BG TSR (P) of existing CST-9 sleeper (M+4) with PSC sleeper (M+8) from km. 23.61 to 48.95 between MXN-NMGY. Total = 25.34 km. (By PQRS Machine) (b) Conversion of SWR track to LWR from km. 23.61 to 48.95 between MXN-NMGY. Total = 25.34 km. |
20/9/2010 |
6/10/2010 3:00:00 PM |
Nil |
|
|
|
|
|
|
|
First : Previous [ 1 2 3 4 5 6 7 8 9 10 ] Next : Last |
|
|